01 / Feasible

Feasible

Rules in, schedule out, with proof.

Write the rules in plain language. Feasible turns them into a schedule and signs a certificate that anyone can re-check offline.

481 tests, including a suite that tries to forge certificates

01 Before and after

Before: a written procedure. After: a valid schedule, and every assignment cites the sentence it came from.

02 How it works

CP-SAT builds the plan. Z3 checks it independently. An Ed25519 signature seals the result, so anyone can re-check the certificate offline.

03 The moment

It caught an illegal 23:30 cleanout and quoted the clause that forbids it.

04 Two domains

Job shop and datacenter capacity.

Feasible planner showing a machine schedule as a timeline
The planner on the job shop scenario.
Feasible planner showing datacenter capacity over time against its redundancy floor
The planner on the datacenter scenario.

05 By the numbers